Each component, one journey: Whether manufactured/assembled in the Poloidal Field Coils building (red, at right), assembled in the Cryostat Workshop (grey, centre), or transported along the heavy haul road (far left), the ITER components will be cleaned and pre-assembled in the Assembly Building, whose steel structure is under construction in the centre of the image. To the right of the image, what is currently an empty lot will be filled by the ITER cryoplant and magnet power conversion buildings.